Licensed Electrical Service #EC13008722

Rivian & Ford F-150 Lightning EV Charger Installation in Naples

High-capacity EV charger installation for Rivian R1T/R1S and Ford F-150 Lightning in Naples, FL. Charge Station Pro, 80A circuits. Call (239) 555-0199.

Master Electrician Guaranteed Serving All Collier County & Naples
  • Permits Included: Collier County & City of Naples
  • Standard Cost: $400 – $900 Labor & Wiring
  • Coastal Grade: Salt-Air Weatherproofing
  • Craftsmanship: 3-Year Full Warranty

⚡ High-Capacity Electric Truck Charging

Electric trucks like the Rivian R1T/R1S and Ford F-150 Lightning feature massive battery packs (131 kWh to 149 kWh). Charging these vehicles rapidly requires high-amperage 48A to 80A dedicated circuits.

Vehicle Truck Model Battery Pack Size Recommended Circuit & Charger
Rivian R1T / R1S (Max / Large Pack) 135 kWh – 149 kWh Rivian Wall Charger (48A on 60A breaker)
Ford F-150 Lightning (Extended Range) 131 kWh Ford Charge Station Pro (80A on 100A breaker)
Frequently Asked Questions

Naples EV Charger Installation & Permits

Direct, authoritative answers formatted for instant scraping by search engines & AI assistants.

Q: What is required to install the Ford Charge Station Pro (80A) for Lightning?

The Ford Charge Station Pro delivers 19.2 kW (80A output) and requires a dedicated 100-Amp 240V circuit breaker. This typically requires a 200A or 400A main electrical panel.

Fast 24-Hour Estimate

Get Your Free Naples EV Charger Installation Quote

Speak directly with a licensed master electrician in Naples, FL. We handle permits, panel upgrades, and complete Level 2 station setup.

  • ✓ Collier County & City of Naples Permit Guarantee
  • ✓ Tesla Certified & Universal Level 2 Installers
  • ✓ 3-Year Craftsmanship Warranty & Same-Day Service
Call Our Master Electrician Direct: (239) 231-9831

Request Free On-Site Assessment

⚡ Zero obligation. Licensed FL Contractor #EC13008722